{"id":225,"date":"2026-07-21T10:00:06","date_gmt":"2026-07-21T10:00:06","guid":{"rendered":"https:\/\/www.p-way.it\/?p=225"},"modified":"2026-08-15T17:33:26","modified_gmt":"2026-08-15T17:33:26","slug":"galleria-caiyuanba-sotto-yangtze","status":"publish","type":"post","link":"https:\/\/www.p-way.it\/en\/galleria-caiyuanba-sotto-yangtze\/","title":{"rendered":"Caiyuanba: the first high-speed line under the Yangtze"},"content":{"rendered":"<p class=\"chapo\">The Yangtze River has always been crossed by railway bridges. With the Caiyuanba Tunnel, completed on July 24, 2026, a high-speed line passes under its bed for the first time. The project is part of the Chongqing\u2013Xiamen corridor, approximately 1,600 km long, and is designed for speeds of 350 km\/h.<\/p>\n<figure><img decoding=\"async\" src=\"https:\/\/www.p-way.it\/wp-content\/uploads\/2026\/08\/articolo-2_img-1_caiyuanba-hero-1.jpg\" alt=\"Galleria Caiyuanba ferroviaria in costruzione\" \/><figcaption>Excavation of a railway tunnel under construction (indicative image).<\/figcaption><\/figure>\n<h2>Why under the river and not above<\/h2>\n<p>The decision to go underwater stems from Chongqing&#039;s urban context. The Yuzhong Peninsula and the southern bank are densely built up and surrounded by hills: there was no room for the entrances and ramps of a new bridge high above the river, in an already saturated urban fabric. The 11.9 km-long tunnel solves the crossing by going deep, with a minimum depth of about 10 meters below the riverbed at the most critical point.<\/p>\n<figure><img decoding=\"async\" src=\"https:\/\/www.p-way.it\/wp-content\/uploads\/2026\/08\/articolo-2_img-3_chongqing-yangtze-1.jpg\" alt=\"Chongqing sul fiume Yangtze\" \/><figcaption>Chongqing, developed on the banks of the Yangtze: an urban context that required underground passage.<\/figcaption><\/figure>\n<blockquote><p>11.9 km of tunnel, excavated with a 12.6 m diameter TBM, maximum water pressure of 9 bar and minimum cover of approximately 10 m below the riverbed.<\/p><\/blockquote>\n<h2>A custom-made cutter for 9 bar of water<\/h2>\n<p>The excavation was carried out with a custom-built Mixshield full-face tunnel boring machine (Herrenknecht), with an excavation diameter of 12.6 meters. This technology maintains pressure on the face by counteracting the soil and water with a bentonite mixture, a crucial requirement when working under a large river. In the deepest sections, the machine operated against hydraulic pressures of up to 9 bar, equivalent to a water column of approximately 90 meters.<\/p>\n<figure><img decoding=\"async\" src=\"https:\/\/www.p-way.it\/wp-content\/uploads\/2026\/08\/articolo-2_img-2_galleria-conci-1.jpg\" alt=\"Imbocco di una galleria ferroviaria\" \/><figcaption>Entrance to a railway tunnel (indicative image).<\/figcaption><\/figure>\n<h2>Karst, faults, and gas: the most treacherous geology<\/h2>\n<p>The route traverses a particularly complex geological landscape: karst formations, a fault zone, and an area affected by coal seam gas. Each of these elements introduces specific risks. Karst cavities and fractured zones can generate sudden water inflows and pressure losses at the face; the presence of gas requires continuous monitoring of the tunnel atmosphere and explosion-proof measures. Under these conditions, monitoring the excavation face, overpressures, and surface subsidence becomes an integral part of the construction method, not simply a post-construction check.<\/p>\n<h2>A piece of the Chongqing\u2013Xiamen corridor<\/h2>\n<p>The tunnel is part of a high-speed line that will connect inland Sichuan and Chongqing to the Fujian coast. Completion of excavation, with the TBM breakthrough in September 2025 and formal completion of the work in July 2026, will solve one of the most challenging issues along the entire corridor.<\/p>\n<hr \/>\n<p class=\"fonti\">Sources: Railway Gazette International (31\/07\/2026); Herrenknecht technical documentation. Data verified at the time of writing.<\/p>","protected":false},"excerpt":{"rendered":"<p>11,9 km scavati con una TBM da 12,6 m di diametro sotto 9 bar di pressione d&#8217;acqua, tra carso, faglie e gas di carbone: la galleria che per la prima volta porta l&#8217;alta velocit\u00e0 sotto il fiume Azzurro.<\/p>","protected":false},"author":1,"featured_media":231,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[18],"tags":[28,51,43,48,49,52,50],"class_list":["post-225","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-world","tag-alta-velocita","tag-chongqing","tag-cina","tag-galleria-ferroviaria","tag-tbm","tag-tunnel-ferroviario","tag-yangtze"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.2 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Galleria Caiyuanba: l&#039;alta velocit\u00e0 sotto lo Yangtze<\/title>\n<meta name=\"description\" content=\"La galleria Caiyuanba porta per la prima volta l&#039;alta velocit\u00e0 sotto lo Yangtze: 11,9 km, TBM da 12,6 m e 9 bar d&#039;acqua, tra carso, faglie e gas.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.p-way.it\/en\/galleria-caiyuanba-sotto-yangtze\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Galleria Caiyuanba: l&#039;alta velocit\u00e0 sotto lo Yangtze\" \/>\n<meta property=\"og:description\" content=\"La galleria Caiyuanba porta per la prima volta l&#039;alta velocit\u00e0 sotto lo Yangtze: 11,9 km, TBM da 12,6 m e 9 bar d&#039;acqua, tra carso, faglie e gas.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.p-way.it\/en\/galleria-caiyuanba-sotto-yangtze\/\" \/>\n<meta property=\"og:site_name\" content=\"P-WAY Engineering\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-21T10:00:06+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-08-15T17:33:26+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.p-way.it\/wp-content\/uploads\/2026\/08\/articolo-2_img-1_caiyuanba-hero-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"1067\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"wp_17670620\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"wp_17670620\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.p-way.it\/galleria-caiyuanba-sotto-yangtze\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.p-way.it\/galleria-caiyuanba-sotto-yangtze\/\"},\"author\":{\"name\":\"wp_17670620\",\"@id\":\"https:\/\/www.p-way.it\/#\/schema\/person\/8f16a750851394709e0b1b0b36d08b8f\"},\"headline\":\"Caiyuanba: la prima linea ad alta velocit\u00e0 che passa sotto lo Yangtze\",\"datePublished\":\"2026-07-21T10:00:06+00:00\",\"dateModified\":\"2026-08-15T17:33:26+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.p-way.it\/galleria-caiyuanba-sotto-yangtze\/\"},\"wordCount\":455,\"publisher\":{\"@id\":\"https:\/\/www.p-way.it\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.p-way.it\/galleria-caiyuanba-sotto-yangtze\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.p-way.it\/wp-content\/uploads\/2026\/08\/articolo-2_img-1_caiyuanba-hero-1.jpg\",\"keywords\":[\"alta velocit\u00e0\",\"Chongqing\",\"Cina\",\"galleria ferroviaria\",\"TBM\",\"tunnel ferroviario\",\"Yangtze\"],\"articleSection\":[\"World\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.p-way.it\/galleria-caiyuanba-sotto-yangtze\/\",\"url\":\"https:\/\/www.p-way.it\/galleria-caiyuanba-sotto-yangtze\/\",\"name\":\"Galleria Caiyuanba: l'alta velocit\u00e0 sotto lo Yangtze\",\"isPartOf\":{\"@id\":\"https:\/\/www.p-way.it\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.p-way.it\/galleria-caiyuanba-sotto-yangtze\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.p-way.it\/galleria-caiyuanba-sotto-yangtze\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.p-way.it\/wp-content\/uploads\/2026\/08\/articolo-2_img-1_caiyuanba-hero-1.jpg\",\"datePublished\":\"2026-07-21T10:00:06+00:00\",\"dateModified\":\"2026-08-15T17:33:26+00:00\",\"description\":\"La galleria Caiyuanba porta per la prima volta l'alta velocit\u00e0 sotto lo Yangtze: 11,9 km, TBM da 12,6 m e 9 bar d'acqua, tra carso, faglie e gas.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.p-way.it\/galleria-caiyuanba-sotto-yangtze\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.p-way.it\/galleria-caiyuanba-sotto-yangtze\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.p-way.it\/galleria-caiyuanba-sotto-yangtze\/#primaryimage\",\"url\":\"https:\/\/www.p-way.it\/wp-content\/uploads\/2026\/08\/articolo-2_img-1_caiyuanba-hero-1.jpg\",\"contentUrl\":\"https:\/\/www.p-way.it\/wp-content\/uploads\/2026\/08\/articolo-2_img-1_caiyuanba-hero-1.jpg\",\"width\":1600,\"height\":1067},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.p-way.it\/galleria-caiyuanba-sotto-yangtze\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.p-way.it\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Caiyuanba: la prima linea ad alta velocit\u00e0 che passa sotto lo Yangtze\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.p-way.it\/#website\",\"url\":\"https:\/\/www.p-way.it\/\",\"name\":\"P-WAY Engineering\",\"description\":\"Ingegneria e consulenza ferroviaria\",\"publisher\":{\"@id\":\"https:\/\/www.p-way.it\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.p-way.it\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.p-way.it\/#organization\",\"name\":\"P-WAY Engineering\",\"url\":\"https:\/\/www.p-way.it\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.p-way.it\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.p-way.it\/wp-content\/uploads\/2025\/01\/Risorsa-7@3x.png\",\"contentUrl\":\"https:\/\/www.p-way.it\/wp-content\/uploads\/2025\/01\/Risorsa-7@3x.png\",\"width\":551,\"height\":190,\"caption\":\"P-WAY Engineering\"},\"image\":{\"@id\":\"https:\/\/www.p-way.it\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.p-way.it\/#\/schema\/person\/8f16a750851394709e0b1b0b36d08b8f\",\"name\":\"wp_17670620\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.p-way.it\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/944ce10ab6e9a9013b0066026f4abc0d6c0c1b6f2fc86d11fec1b3801ed770e7?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/944ce10ab6e9a9013b0066026f4abc0d6c0c1b6f2fc86d11fec1b3801ed770e7?s=96&d=mm&r=g\",\"caption\":\"wp_17670620\"},\"sameAs\":[\"https:\/\/www.p-way.it\"],\"url\":\"https:\/\/www.p-way.it\/en\/author\/wp_17670620\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Galleria Caiyuanba: l'alta velocit\u00e0 sotto lo Yangtze","description":"La galleria Caiyuanba porta per la prima volta l'alta velocit\u00e0 sotto lo Yangtze: 11,9 km, TBM da 12,6 m e 9 bar d'acqua, tra carso, faglie e gas.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.p-way.it\/en\/galleria-caiyuanba-sotto-yangtze\/","og_locale":"en_GB","og_type":"article","og_title":"Galleria Caiyuanba: l'alta velocit\u00e0 sotto lo Yangtze","og_description":"La galleria Caiyuanba porta per la prima volta l'alta velocit\u00e0 sotto lo Yangtze: 11,9 km, TBM da 12,6 m e 9 bar d'acqua, tra carso, faglie e gas.","og_url":"https:\/\/www.p-way.it\/en\/galleria-caiyuanba-sotto-yangtze\/","og_site_name":"P-WAY Engineering","article_published_time":"2026-07-21T10:00:06+00:00","article_modified_time":"2026-08-15T17:33:26+00:00","og_image":[{"width":1600,"height":1067,"url":"https:\/\/www.p-way.it\/wp-content\/uploads\/2026\/08\/articolo-2_img-1_caiyuanba-hero-1.jpg","type":"image\/jpeg"}],"author":"wp_17670620","twitter_card":"summary_large_image","twitter_misc":{"Written by":"wp_17670620","Estimated reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.p-way.it\/galleria-caiyuanba-sotto-yangtze\/#article","isPartOf":{"@id":"https:\/\/www.p-way.it\/galleria-caiyuanba-sotto-yangtze\/"},"author":{"name":"wp_17670620","@id":"https:\/\/www.p-way.it\/#\/schema\/person\/8f16a750851394709e0b1b0b36d08b8f"},"headline":"Caiyuanba: la prima linea ad alta velocit\u00e0 che passa sotto lo Yangtze","datePublished":"2026-07-21T10:00:06+00:00","dateModified":"2026-08-15T17:33:26+00:00","mainEntityOfPage":{"@id":"https:\/\/www.p-way.it\/galleria-caiyuanba-sotto-yangtze\/"},"wordCount":455,"publisher":{"@id":"https:\/\/www.p-way.it\/#organization"},"image":{"@id":"https:\/\/www.p-way.it\/galleria-caiyuanba-sotto-yangtze\/#primaryimage"},"thumbnailUrl":"https:\/\/www.p-way.it\/wp-content\/uploads\/2026\/08\/articolo-2_img-1_caiyuanba-hero-1.jpg","keywords":["alta velocit\u00e0","Chongqing","Cina","galleria ferroviaria","TBM","tunnel ferroviario","Yangtze"],"articleSection":["World"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/www.p-way.it\/galleria-caiyuanba-sotto-yangtze\/","url":"https:\/\/www.p-way.it\/galleria-caiyuanba-sotto-yangtze\/","name":"Galleria Caiyuanba: l'alta velocit\u00e0 sotto lo Yangtze","isPartOf":{"@id":"https:\/\/www.p-way.it\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.p-way.it\/galleria-caiyuanba-sotto-yangtze\/#primaryimage"},"image":{"@id":"https:\/\/www.p-way.it\/galleria-caiyuanba-sotto-yangtze\/#primaryimage"},"thumbnailUrl":"https:\/\/www.p-way.it\/wp-content\/uploads\/2026\/08\/articolo-2_img-1_caiyuanba-hero-1.jpg","datePublished":"2026-07-21T10:00:06+00:00","dateModified":"2026-08-15T17:33:26+00:00","description":"La galleria Caiyuanba porta per la prima volta l'alta velocit\u00e0 sotto lo Yangtze: 11,9 km, TBM da 12,6 m e 9 bar d'acqua, tra carso, faglie e gas.","breadcrumb":{"@id":"https:\/\/www.p-way.it\/galleria-caiyuanba-sotto-yangtze\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.p-way.it\/galleria-caiyuanba-sotto-yangtze\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.p-way.it\/galleria-caiyuanba-sotto-yangtze\/#primaryimage","url":"https:\/\/www.p-way.it\/wp-content\/uploads\/2026\/08\/articolo-2_img-1_caiyuanba-hero-1.jpg","contentUrl":"https:\/\/www.p-way.it\/wp-content\/uploads\/2026\/08\/articolo-2_img-1_caiyuanba-hero-1.jpg","width":1600,"height":1067},{"@type":"BreadcrumbList","@id":"https:\/\/www.p-way.it\/galleria-caiyuanba-sotto-yangtze\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.p-way.it\/"},{"@type":"ListItem","position":2,"name":"Caiyuanba: la prima linea ad alta velocit\u00e0 che passa sotto lo Yangtze"}]},{"@type":"WebSite","@id":"https:\/\/www.p-way.it\/#website","url":"https:\/\/www.p-way.it\/","name":"P-WAY Engineering","description":"Railway engineering and consultancy","publisher":{"@id":"https:\/\/www.p-way.it\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.p-way.it\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/www.p-way.it\/#organization","name":"P-WAY Engineering","url":"https:\/\/www.p-way.it\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.p-way.it\/#\/schema\/logo\/image\/","url":"https:\/\/www.p-way.it\/wp-content\/uploads\/2025\/01\/Risorsa-7@3x.png","contentUrl":"https:\/\/www.p-way.it\/wp-content\/uploads\/2025\/01\/Risorsa-7@3x.png","width":551,"height":190,"caption":"P-WAY Engineering"},"image":{"@id":"https:\/\/www.p-way.it\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.p-way.it\/#\/schema\/person\/8f16a750851394709e0b1b0b36d08b8f","name":"wp_17670620","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.p-way.it\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/944ce10ab6e9a9013b0066026f4abc0d6c0c1b6f2fc86d11fec1b3801ed770e7?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/944ce10ab6e9a9013b0066026f4abc0d6c0c1b6f2fc86d11fec1b3801ed770e7?s=96&d=mm&r=g","caption":"wp_17670620"},"sameAs":["https:\/\/www.p-way.it"],"url":"https:\/\/www.p-way.it\/en\/author\/wp_17670620\/"}]}},"_links":{"self":[{"href":"https:\/\/www.p-way.it\/en\/wp-json\/wp\/v2\/posts\/225","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.p-way.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.p-way.it\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.p-way.it\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.p-way.it\/en\/wp-json\/wp\/v2\/comments?post=225"}],"version-history":[{"count":2,"href":"https:\/\/www.p-way.it\/en\/wp-json\/wp\/v2\/posts\/225\/revisions"}],"predecessor-version":[{"id":240,"href":"https:\/\/www.p-way.it\/en\/wp-json\/wp\/v2\/posts\/225\/revisions\/240"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.p-way.it\/en\/wp-json\/wp\/v2\/media\/231"}],"wp:attachment":[{"href":"https:\/\/www.p-way.it\/en\/wp-json\/wp\/v2\/media?parent=225"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.p-way.it\/en\/wp-json\/wp\/v2\/categories?post=225"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.p-way.it\/en\/wp-json\/wp\/v2\/tags?post=225"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}