{"id":118,"date":"2024-12-10T16:01:16","date_gmt":"2024-12-10T16:01:16","guid":{"rendered":"https:\/\/www.p-way.it\/?p=118"},"modified":"2026-08-15T18:42:59","modified_gmt":"2026-08-15T18:42:59","slug":"deviatoi-un-introduzione","status":"publish","type":"post","link":"https:\/\/www.p-way.it\/en\/deviatoi-un-introduzione\/","title":{"rendered":"Switches, an introduction"},"content":{"rendered":"<p data-pm-slice=\"1 1 []\">Rail switches, also known as switches or track switches, are essential elements of railway infrastructure, allowing trains to change direction on different tracks. These mechanisms are used in stations, intersections, junctions, and depots, ensuring operational flexibility in the railway system. The analysis of structural elements, geometric characteristics, and inspection and maintenance methods is essential to the safety and efficiency of rail transport.<\/p>\n<h3>Structural elements of railway switches<\/h3>\n<p>A railway switch consists of several essential components:<\/p>\n<ul data-spread=\"false\">\n<li><strong>Straight branch<\/strong>, which represents the primary path.<\/li>\n<li><strong>Deviated branch<\/strong>, which allows the train to change direction.<\/li>\n<li><strong>Geometric center<\/strong>, point of intersection between the axes of the main and diverted track.<\/li>\n<li><strong>Needle<\/strong>, a moving element that guides the train when changing tracks.<\/li>\n<li><strong>Contrago,<\/strong> fixed structure on which the movable rails move.<\/li>\n<li><strong>Intermediate rails<\/strong>, connecting elements between the base rail and the heart.<\/li>\n<li><strong>Counter rail (guide rail)<\/strong>, positioned in front of the heart position to guide the wheel.<\/li>\n<li><strong>Needle frame<\/strong>, structural support of the needles.<\/li>\n<li><strong>Heart area<\/strong>, heart and counterrail support.<\/li>\n<\/ul>\n<h3>Classification of railway switches<\/h3>\n<p>Railway switches can be classified according to:<\/p>\n<ul data-spread=\"false\">\n<li><strong>Rail type<\/strong>, characterized by weight per linear meter.<\/li>\n<li><strong>Radius of curvature<\/strong>, determined by the geometry of the exchange.<\/li>\n<li><strong>Tangent of the exit angle<\/strong>, parameter that characterizes the inclination of the diverted track.<\/li>\n<\/ul>\n<p>From a geometric point of view, exchanges are divided into:<\/p>\n<ul data-spread=\"false\">\n<li><strong>Simple exchange<\/strong>, which allows the train to be diverted to another track.<\/li>\n<li><strong>Double exchange<\/strong>, which allows the connection between multiple tracks.<\/li>\n<li><strong>Intersections<\/strong>, configurations in which two tracks cross.<\/li>\n<li><strong>English exchange<\/strong>, combination of two switches and an intersection.<\/li>\n<\/ul>\n<h3>Geometric characteristics of railway switches<\/h3>\n<p>To ensure correct operation and high safety, some geometric parameters must be constantly monitored:<\/p>\n<ul data-spread=\"true\">\n<li><strong>Exchange Corner<\/strong>, determined by the ratio between the main and diverted track.<\/li>\n<li><strong>Radius of curvature<\/strong>, an essential parameter for determining travel speed.<\/li>\n<li><strong>Gauge<\/strong>, distance between the rails which must respect defined standards to avoid derailments.<\/li>\n<li><strong>Needle and counter-rail dimensions<\/strong>, essential measurements to ensure correct alignment of the moving and guide rails.<\/li>\n<li><strong>Free passage quotas<\/strong>, measurements necessary to ensure sufficient space for the transit of convoys.<\/li>\n<\/ul>\n<h3>Importance of geometric features<\/h3>\n<ul data-spread=\"false\">\n<li><strong>Safety<\/strong>: correct geometry reduces the risk of derailment and improves the stability of the convoy.<\/li>\n<li><strong>Operational efficiency<\/strong>: appropriate geometric parameters optimize the speed and fluidity of rail traffic.<\/li>\n<li><strong>Wear and maintenance<\/strong>: accurate monitoring allows you to reduce component wear and plan preventative maintenance interventions.<\/li>\n<\/ul>\n<h3>Methods for detecting geometric features<\/h3>\n<p>Inspection of railway switches is carried out using manual and automated technologies:<\/p>\n<ul data-spread=\"false\">\n<li><strong>Visual inspections<\/strong>, carried out by specialized technical personnel.<\/li>\n<li><strong>Manual measurements<\/strong>, through calibration and measurement tools.<\/li>\n<li><strong>Diagnostic trains<\/strong>, equipped with advanced sensors for dynamic analysis of track conditions.<\/li>\n<li><strong>Robotic trolleys<\/strong>, high-precision automatic devices.<\/li>\n<li><strong>Software analysis<\/strong>, IT tools that process the collected data to identify anomalies and plan interventions.<\/li>\n<\/ul>\n<h3>Maintenance and inspection<\/h3>\n<p>To ensure the reliability of railway switches, maintenance operations include:<\/p>\n<ul data-spread=\"false\">\n<li><strong>Lubrication<\/strong>, to reduce friction between moving parts.<\/li>\n<li><strong>Regulation<\/strong>, to correct any misalignments.<\/li>\n<li><strong>Replacement of worn components<\/strong>, to prevent failures.<\/li>\n<li><strong>Heating systems<\/strong>, used in areas subject to adverse weather conditions.<\/li>\n<\/ul>\n<p>Regular inspection includes:<\/p>\n<ul data-spread=\"false\">\n<li><strong>Visual checks<\/strong>, to detect signs of wear and damage.<\/li>\n<li><strong>Geometric measurements<\/strong>, to detect variations from the standards.<\/li>\n<li><strong>Diagnostic data analysis<\/strong>, to optimize the planning of maintenance interventions.<\/li>\n<\/ul>\n<h3>Conclusion<\/h3>\n<p>Rail switches are critical to the safety and efficiency of the railway infrastructure. Careful design, constant monitoring of geometric characteristics, and the adoption of advanced maintenance technologies are essential to ensuring the long-term stability of the railway system.<\/p>\n<p><strong>Related service:<\/strong> <a href=\"\/en\/armamento-ferroviario\/\">Railway superstructure design<\/a> by P-WAY Engineering.<\/p>","protected":false},"excerpt":{"rendered":"<p>Gli scambi ferroviari, noti anche come deviatoi o apparecchi di binario, rappresentano elementi essenziali dell&#8217;infrastruttura ferroviaria, consentendo ai convogli di modificare la propria direzione su diversi binari. Questi meccanismi trovano impiego in stazioni, incroci, raccordi e depositi, garantendo flessibilit\u00e0 operativa nel sistema ferroviario. L&#8217;analisi degli elementi strutturali, delle caratteristiche geometriche e delle metodologie di ispezione [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":119,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13,1],"tags":[],"class_list":["post-118","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tecnica","category-uncategorized"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.2 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Deviatoi, un introduzione - P-WAY Engineering<\/title>\n<meta name=\"description\" content=\"Analisi tecnica degli scambi ferroviari: struttura, classificazione, caratteristiche geometriche e metodologie di ispezione e manutenzione.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.p-way.it\/en\/deviatoi-un-introduzione\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Deviatoi, un introduzione - P-WAY Engineering\" \/>\n<meta property=\"og:description\" content=\"Analisi tecnica degli scambi ferroviari: struttura, classificazione, caratteristiche geometriche e metodologie di ispezione e manutenzione.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.p-way.it\/en\/deviatoi-un-introduzione\/\" \/>\n<meta property=\"og:site_name\" content=\"P-WAY Engineering\" \/>\n<meta property=\"article:published_time\" content=\"2024-12-10T16:01:16+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-08-15T18:42:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.p-way.it\/wp-content\/uploads\/2025\/01\/bruno-kelzer-zZoscDXH6ss-unsplash-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1440\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"wp_17670620\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"wp_17670620\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.p-way.it\/deviatoi-un-introduzione\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.p-way.it\/deviatoi-un-introduzione\/\"},\"author\":{\"name\":\"wp_17670620\",\"@id\":\"https:\/\/www.p-way.it\/#\/schema\/person\/8f16a750851394709e0b1b0b36d08b8f\"},\"headline\":\"Deviatoi, un introduzione\",\"datePublished\":\"2024-12-10T16:01:16+00:00\",\"dateModified\":\"2026-08-15T18:42:59+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.p-way.it\/deviatoi-un-introduzione\/\"},\"wordCount\":618,\"publisher\":{\"@id\":\"https:\/\/www.p-way.it\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.p-way.it\/deviatoi-un-introduzione\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.p-way.it\/wp-content\/uploads\/2025\/01\/bruno-kelzer-zZoscDXH6ss-unsplash-scaled.jpg\",\"articleSection\":[\"Tecnica\",\"Uncategorized\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.p-way.it\/deviatoi-un-introduzione\/\",\"url\":\"https:\/\/www.p-way.it\/deviatoi-un-introduzione\/\",\"name\":\"Deviatoi, un introduzione - P-WAY Engineering\",\"isPartOf\":{\"@id\":\"https:\/\/www.p-way.it\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.p-way.it\/deviatoi-un-introduzione\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.p-way.it\/deviatoi-un-introduzione\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.p-way.it\/wp-content\/uploads\/2025\/01\/bruno-kelzer-zZoscDXH6ss-unsplash-scaled.jpg\",\"datePublished\":\"2024-12-10T16:01:16+00:00\",\"dateModified\":\"2026-08-15T18:42:59+00:00\",\"description\":\"Analisi tecnica degli scambi ferroviari: struttura, classificazione, caratteristiche geometriche e metodologie di ispezione e manutenzione.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.p-way.it\/deviatoi-un-introduzione\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.p-way.it\/deviatoi-un-introduzione\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.p-way.it\/deviatoi-un-introduzione\/#primaryimage\",\"url\":\"https:\/\/www.p-way.it\/wp-content\/uploads\/2025\/01\/bruno-kelzer-zZoscDXH6ss-unsplash-scaled.jpg\",\"contentUrl\":\"https:\/\/www.p-way.it\/wp-content\/uploads\/2025\/01\/bruno-kelzer-zZoscDXH6ss-unsplash-scaled.jpg\",\"width\":2560,\"height\":1440},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.p-way.it\/deviatoi-un-introduzione\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.p-way.it\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Deviatoi, un introduzione\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.p-way.it\/#website\",\"url\":\"https:\/\/www.p-way.it\/\",\"name\":\"P-WAY Engineering\",\"description\":\"Ingegneria e consulenza ferroviaria\",\"publisher\":{\"@id\":\"https:\/\/www.p-way.it\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.p-way.it\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.p-way.it\/#organization\",\"name\":\"P-WAY Engineering\",\"url\":\"https:\/\/www.p-way.it\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.p-way.it\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.p-way.it\/wp-content\/uploads\/2025\/01\/Risorsa-7@3x.png\",\"contentUrl\":\"https:\/\/www.p-way.it\/wp-content\/uploads\/2025\/01\/Risorsa-7@3x.png\",\"width\":551,\"height\":190,\"caption\":\"P-WAY Engineering\"},\"image\":{\"@id\":\"https:\/\/www.p-way.it\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.p-way.it\/#\/schema\/person\/8f16a750851394709e0b1b0b36d08b8f\",\"name\":\"wp_17670620\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.p-way.it\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/944ce10ab6e9a9013b0066026f4abc0d6c0c1b6f2fc86d11fec1b3801ed770e7?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/944ce10ab6e9a9013b0066026f4abc0d6c0c1b6f2fc86d11fec1b3801ed770e7?s=96&d=mm&r=g\",\"caption\":\"wp_17670620\"},\"sameAs\":[\"https:\/\/www.p-way.it\"],\"url\":\"https:\/\/www.p-way.it\/en\/author\/wp_17670620\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Deviatoi, un introduzione - P-WAY Engineering","description":"Analisi tecnica degli scambi ferroviari: struttura, classificazione, caratteristiche geometriche e metodologie di ispezione e manutenzione.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.p-way.it\/en\/deviatoi-un-introduzione\/","og_locale":"en_GB","og_type":"article","og_title":"Deviatoi, un introduzione - P-WAY Engineering","og_description":"Analisi tecnica degli scambi ferroviari: struttura, classificazione, caratteristiche geometriche e metodologie di ispezione e manutenzione.","og_url":"https:\/\/www.p-way.it\/en\/deviatoi-un-introduzione\/","og_site_name":"P-WAY Engineering","article_published_time":"2024-12-10T16:01:16+00:00","article_modified_time":"2026-08-15T18:42:59+00:00","og_image":[{"width":2560,"height":1440,"url":"https:\/\/www.p-way.it\/wp-content\/uploads\/2025\/01\/bruno-kelzer-zZoscDXH6ss-unsplash-scaled.jpg","type":"image\/jpeg"}],"author":"wp_17670620","twitter_card":"summary_large_image","twitter_misc":{"Written by":"wp_17670620","Estimated reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.p-way.it\/deviatoi-un-introduzione\/#article","isPartOf":{"@id":"https:\/\/www.p-way.it\/deviatoi-un-introduzione\/"},"author":{"name":"wp_17670620","@id":"https:\/\/www.p-way.it\/#\/schema\/person\/8f16a750851394709e0b1b0b36d08b8f"},"headline":"Deviatoi, un introduzione","datePublished":"2024-12-10T16:01:16+00:00","dateModified":"2026-08-15T18:42:59+00:00","mainEntityOfPage":{"@id":"https:\/\/www.p-way.it\/deviatoi-un-introduzione\/"},"wordCount":618,"publisher":{"@id":"https:\/\/www.p-way.it\/#organization"},"image":{"@id":"https:\/\/www.p-way.it\/deviatoi-un-introduzione\/#primaryimage"},"thumbnailUrl":"https:\/\/www.p-way.it\/wp-content\/uploads\/2025\/01\/bruno-kelzer-zZoscDXH6ss-unsplash-scaled.jpg","articleSection":["Tecnica","Uncategorized"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/www.p-way.it\/deviatoi-un-introduzione\/","url":"https:\/\/www.p-way.it\/deviatoi-un-introduzione\/","name":"Deviatoi, un introduzione - P-WAY Engineering","isPartOf":{"@id":"https:\/\/www.p-way.it\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.p-way.it\/deviatoi-un-introduzione\/#primaryimage"},"image":{"@id":"https:\/\/www.p-way.it\/deviatoi-un-introduzione\/#primaryimage"},"thumbnailUrl":"https:\/\/www.p-way.it\/wp-content\/uploads\/2025\/01\/bruno-kelzer-zZoscDXH6ss-unsplash-scaled.jpg","datePublished":"2024-12-10T16:01:16+00:00","dateModified":"2026-08-15T18:42:59+00:00","description":"Analisi tecnica degli scambi ferroviari: struttura, classificazione, caratteristiche geometriche e metodologie di ispezione e manutenzione.","breadcrumb":{"@id":"https:\/\/www.p-way.it\/deviatoi-un-introduzione\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.p-way.it\/deviatoi-un-introduzione\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.p-way.it\/deviatoi-un-introduzione\/#primaryimage","url":"https:\/\/www.p-way.it\/wp-content\/uploads\/2025\/01\/bruno-kelzer-zZoscDXH6ss-unsplash-scaled.jpg","contentUrl":"https:\/\/www.p-way.it\/wp-content\/uploads\/2025\/01\/bruno-kelzer-zZoscDXH6ss-unsplash-scaled.jpg","width":2560,"height":1440},{"@type":"BreadcrumbList","@id":"https:\/\/www.p-way.it\/deviatoi-un-introduzione\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.p-way.it\/"},{"@type":"ListItem","position":2,"name":"Deviatoi, un introduzione"}]},{"@type":"WebSite","@id":"https:\/\/www.p-way.it\/#website","url":"https:\/\/www.p-way.it\/","name":"P-WAY Engineering","description":"Railway engineering and consultancy","publisher":{"@id":"https:\/\/www.p-way.it\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.p-way.it\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/www.p-way.it\/#organization","name":"P-WAY Engineering","url":"https:\/\/www.p-way.it\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.p-way.it\/#\/schema\/logo\/image\/","url":"https:\/\/www.p-way.it\/wp-content\/uploads\/2025\/01\/Risorsa-7@3x.png","contentUrl":"https:\/\/www.p-way.it\/wp-content\/uploads\/2025\/01\/Risorsa-7@3x.png","width":551,"height":190,"caption":"P-WAY Engineering"},"image":{"@id":"https:\/\/www.p-way.it\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.p-way.it\/#\/schema\/person\/8f16a750851394709e0b1b0b36d08b8f","name":"wp_17670620","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.p-way.it\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/944ce10ab6e9a9013b0066026f4abc0d6c0c1b6f2fc86d11fec1b3801ed770e7?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/944ce10ab6e9a9013b0066026f4abc0d6c0c1b6f2fc86d11fec1b3801ed770e7?s=96&d=mm&r=g","caption":"wp_17670620"},"sameAs":["https:\/\/www.p-way.it"],"url":"https:\/\/www.p-way.it\/en\/author\/wp_17670620\/"}]}},"_links":{"self":[{"href":"https:\/\/www.p-way.it\/en\/wp-json\/wp\/v2\/posts\/118","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.p-way.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.p-way.it\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.p-way.it\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.p-way.it\/en\/wp-json\/wp\/v2\/comments?post=118"}],"version-history":[{"count":3,"href":"https:\/\/www.p-way.it\/en\/wp-json\/wp\/v2\/posts\/118\/revisions"}],"predecessor-version":[{"id":289,"href":"https:\/\/www.p-way.it\/en\/wp-json\/wp\/v2\/posts\/118\/revisions\/289"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.p-way.it\/en\/wp-json\/wp\/v2\/media\/119"}],"wp:attachment":[{"href":"https:\/\/www.p-way.it\/en\/wp-json\/wp\/v2\/media?parent=118"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.p-way.it\/en\/wp-json\/wp\/v2\/categories?post=118"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.p-way.it\/en\/wp-json\/wp\/v2\/tags?post=118"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}